Township of North Dundas Logo

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2001 Performance Measures

Environmental Services
Solid Waste (Garbage) Management
Solid Waste Management (Integrated System) $116.69 $ per household Explanation: Average operating costs for solid waste management per household.

Objective: Efficient collection services.

Waste Diversion 21.12% % solid waste Explanation: The percentage of residential waste diverted (based on combined residential and ICI tonnage).

Objective: Waste programs divert garbage from landfills and incinerators.

Wastewater (Sewage) Services
Wastewater Collection, Treatment and Disposal (Integrated System) $309.12 $ per megalitre Explanation: The operating cost for collection, treatment and disposal of wastewater per megalitre.

Objective: Efficient wastewater collection, treatment and disposal services.

Wastewater Main Backups 3.8462 # of wastewater main backups per 100 kilometres of wastewater main. Explanation: The number of wastewater main backups per 100 kilometers of wastewater main in a year..

Objective: To ensure Municipal sewage management practices prevent environmental and human health hazards.

Wastewater Bypasses Treatment
0.00%
% of wastewater Explanation:  The percentage of wastewater estimated to have bypassed treatment.

Objective:  To ensure Municipal sewage management practices prevent environmental and human health hazards.

Water Services
Treatment & Distribution of Drinking Quality Water (Integrated System) $383.05 $ per million litres Explanation: The cost per million litres to treat and distribute drinking water.

Objective: Efficient municipal water treatment services.

Water Main Breaks 2.2727 # breaks per 100 km Explanation: The number of breaks in water mains in a year that required repair per 100 km of watermain.

Objective: To minimize the loss of treated water.

Boil Water Advisories 0.00 # days Explanation: The number of days when a boil water advisory, issued by the medical officer of health, was in effect for part or all of the municipal water supply.

Objective: Water is safe and meets local needs.

Transportation Services
Road Services
Winter Road Maintenance Costs

$328.02

$/km Explanation: The operating costs per lane kilometre associated with winter road maintenance (e.g. snow plowing, salting, sanding, snow removal).

Objective: Efficient winter road maintenance services.

Winter Event Responses

93.62%

% Explanation: The percentage of winter road control activities (snow plowing, road salting, etc.) in response to a weather condition (snowfall, sleet, freezing rain, etc.) that met or exceeded municipal road maintenance standards.

Objective: To provide an appropriate winter storm event response to ensure that any inconvenience and disruption in transportation caused by the storm is minimized.

Paved Roads

$927.35

$ per paved land kilometre Explanation:  The operating costs for paved (hard top) roads per land kilometre.

Objective:  Efficient road maintenance.

Unpaved Roads $1057.74 $ per unpaved land kilometre Explanation:  The operation costs for unpaved (loose top) roads per land kilometre.

Objective:  Efficient road maintenance.

Adequacy of Roads

71.14%

% of lane kilometres tested were rated as good to very good. Explanation:  Percentage of paved lane kilometres rated as good to very good.

Objective:  To provide a paved road system that has a pavement condition that meets municipal objectives.

Protection Services
Fire Services
Fire Protection Costs

$0.37

$ per $1,000 of assessment Explanation: The operating costs per thousand dollars of assessment for fire services which includes firefighters, fire prevention, emergency responses, equipment and administration.

Objective: Efficient municipal fire services.

Police Services (Crime Rate)
Violent Crime 10.44 # of violent crimes per 1,000 people Explanation:  Total number of actual incidents of violent crime, including youths.

Objective:  Safe communities.

Property Crime 24.42 # of property crimes per 1,000 people Explanation:  Total number of actual incidents of property crime, including youths.

Objective:  Safe communities.

Youth Crime 2.45 # of youth crimes per 1,000 people Explanation:  Total number of actual incidents of youth crime.

Objective:  Safe communities.

Total Crimes

43.85

# of crimes per 1,000 people Explanation:  Total number of Crimes per 1,000 people.

Objective:  Safe communities.

General Government
Municipal Administration
Operating Costs

3.02%

% of total municipal operating costs Explanation: The cost for general government as a percentage of total municipal operating costs (based on general government support).

Objective: Efficient general government support of local services.

Planning and Development
Land Use Planning
Location of New Development

80.36%

% of new lots, blocks and/or units Explanation:  The percentage of new lots, blocks and/or units with final approval that are located within settlement areas.

Objective:  To ensure new lot creation is occurring in settlement areas.

New development with final approval which is located within settlement area
New Lots 43 # of Lots

Explanation: Number of new lots within settlement areas

Objective: New lot creation is occurring in settlement areas.

 

New Blocks 2 # of Blocks

Explanation: Number of new blocks within settlement areas

Objective: New block creation is occurring in settlement areas.

New development with final approval within entire municipality
New Lots 54 # of Lots

Explanation: Number of new lots within settlement areas

Objective: New lot creation is occurring in settlement areas.

New Blocks 2 # of Blocks

Explanation:  Number of new block within settlement areas

Objective: New block creation is occurring in settlement areas.

Preservation of Agricultural Land in Reporting Year 100% % of Land

Explanation: Percentage of Land Designated for agricultural purposes, which was preserved during the reporting year.

Objective: Preservation of agricultural land.

Preservation of Agricultural Land Relative to Base Year 99.99% % of Land

Explanation: Percentage of land designated for agricultural purposes in the Official Plan was preserved relative to the base year of 2000.

Objective: Preservation of agricultural land in reporting year.

Change in number of designated hectares since January 1, 2000 1 # of Hectares

Explanation: Number of hectares that were redesignated from agricultural purposes to other uses since January 1, 2000.

Objective: Preservation of agricultural land.

Note 1: There is no weigh scale at the landfill site, tonnage is estimated.